Feeder Dam 5

Mile 106.8 - Just before this dam is something you don't see that often on the canal:  a hill!  The canal starts shallow but gets very deep as the hill progresses and leads to the dam.

There's a plaque that reads:

Floods occur at regular intervals in the Potomac Valley.  Between 1829 and 1998, there have been 144 recorded floods or high water occurrences.  Repairing flood damage was a continuing battle for the C & O Canal Company and is still a problem for the National Park Service.  During periods of low water, the remains of the original crib and rubble dam, destroyed by floods, can be seen downstream from the present dam built in 1857.

In 1998, the guard lock and flume were filled with soil to halt the collapse of the stone walls.  A section of towpath that was collapsing was replaced with "Roller Compacted Concrete (RRC)" which is a concrete mix with a small amount of cement and a high amount of gravel.  The stone for the aggregate was acquired locally to the match the stone already used here.  The RRC is spread and compacted by a roller and does not require formwork like conventional concrete.  By filling the lock and bypass flume, and reconstructing the towpath and guard dike, the National Park Service is trying to protect the historical structures here from future flood damage.

horizontal rule

The towpath rests on a concrete platform.  This is what the plaque referred to as the "towpath and guard dike".    If you stop by the Williamsport Visitors' Center, you can see a photo of the stone wall it replaced.



horizontal rule

PIC00018.JPG (62506 bytes)Past the small bridge over the canal, the canal stops for a couple of miles.  Use the bridge to cross over to the other side where the towpath continues.



horizontal rule

This is the inlet lock that was filled in.  Canal traffic from here to Lock 45 was routed to slackwater along the Potomac River via this lock.



horizontal rule

wpe33.gif (141822 bytes)Aerial view

 